Xian on channel 7 subway shield captain le slope initial
- Categories:Trade News
- Time of issue:2022-06-15
(Summary description)The China railway construction group of ten game for subway line one 12 standard engineering including: changle slope ~ station of wanshou road, PRC tonghua stand, tonghua door to door stood to KangFu
Xian on channel 7 subway shield captain le slope initial
(Summary description)The China railway construction group of ten game for subway line one 12 standard engineering including: changle slope ~ station of wanshou road, PRC tonghua stand, tonghua door to door stood to KangFu
- Categories:Trade News
- Time of issue:2022-06-15 16:23
- Views:
The China railway construction group of ten game for subway line one 12 standard engineering including: changle slope ~ station of wanshou road, PRC tonghua stand, tonghua door to door stood to KangFuLu stand three shield interval, underground tunnel of two section, interval wind Wells a, interval is a 3748.85 YanMi double. This project in March 18, 2009 start work, plan in early 2012 to finish.
This platform shield construction machine changle slope from standing initial, changle along the road extends from east to west, through the station of wanshou road, tonghua door stood, and finally to KangFuLu hoisted out standing collapse. Two sets of shield construction machine has 2 times a type of tunnel, 2 times over the station (station of wanshou road, tonghua door station), takes four initial and four arrived, construction process conversion frequently. At present, the F5 underground tunnel has on June 15 finish work early stents, going into the ?
Scan the QR code to read on your phone
Key words: hield tool Engineering tool Wear-resistant heart
Related news
-
In 2010 China's yunnan province on southeast Asia, South Asia four highways built
The administration authority in yunnan province and yunnan province for southeast Asia, South Asia of the direction of article 4 of high grade highway construction progress faster, to 2010, article 4 - In the large shield construction machine developed technology to reach international level-shield construction machine 06-15
- Beijing metro line no. 10 second phase of all the first paragraph shield construction machine interval breakthrough 06-15
- Xian on channel 7 subway shield captain le slope initial 06-15
- Mor will receive more than 200 billion financing support south, north car get yuan arrears 06-15
Contact Us
Tel:0379-65196583 / 65196588
Email:luoyang-jj@qq.com jjkj-xsb@lyjj.com
Fax:0379-65196584
Add:139, Fengrun East Road, High-tech Development Zone, Luoyang, Henan